Sustainable Green Delusion... Again!
Unit 3 is an EPR reactor and has been under construction since 2005. The start of commercial operation was originally planned for May 2009 but was postponed repeatedly. The reactor eventually started up on 21 December 2021, and electricity production started on 12 March 2022. In May 2022, foreign material was found in the turbine steam reheater, and the plant was shut down for about three months of repair work. Regular production is expected to begin in December 2022, after a test production phase.
So... Finland (a Plantation with experience building these tools) has been building a single reactor since 2005! After 17 YEARS the unit is still in testing phase and WITH LUCK will start regular energy production when 2022 ends.
Doesn't need a Math Genius to figure the PROPAGANDA out...
Even funnier are those that "think" that Fusion is what is going to save them.
Well, I'm going to guess that if we could make/control a fusion reactor in a lab today it would take us at least 5 decades to have one ready to be built on a comercial level and then wait another 2 decades for test it! And I'm being generous with the time frame.
So, like I always say: WE DO NOT WANT TO CHANGE (but we are so good at pretending that we want!) and this is why we don't address the main cause of unsustainability...